PETROLEUM NEWS.
OPERATIONS AT MOTDHOA. At No. 1 and 2 bores of the Taranaki IPetroleum Company,' work is progressing satisfactorily, but the delay in arrival of the casing still holds up the operations at No. 3. The (three underground tanks at No. 2 are full of oil, and t'he steady flow has poured quite a large quantity into the new ana fourth well.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/TDN19100928.2.76
Bibliographic details
Ngā taipitopito pukapuka
Taranaki Daily News, Volume LIII, Issue 145, 28 September 1910, Page 8
Word count
Tapeke kupu
63PETROLEUM NEWS. Taranaki Daily News, Volume LIII, Issue 145, 28 September 1910, Page 8
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Taranaki Daily News. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.