OUR RAILWAY PROGRESS
A BIG BUILDING PROGRAMME. By Telegraph—Press Association. Wellington, Yesterday. The Railway Department will take over 125 miles of new line from the Public Works Department this year. Ten tank engines of the W.F .class, ten compound engines of the B class, and ten A engines are being constructed, besides which 1000 waggons for various descriptions of goods traffic are included in the building programme for the vear.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/TDN19100519.2.45
Bibliographic details
Ngā taipitopito pukapuka
Taranaki Daily News, Volume LII, Issue 393, 19 May 1910, Page 5
Word count
Tapeke kupu
70OUR RAILWAY PROGRESS Taranaki Daily News, Volume LII, Issue 393, 19 May 1910, Page 5
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Taranaki Daily News. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.