The site of the Taupo Borough Council's second power project on the Hinemaiaia River. The retaining wall for the dam will cut across the earthworks in the centre of the picture and the water will back up through the "S" shaped scrub covered gorge just above which it is 50ft. deep. The earthworks in the background show the area from which scrub and trees have been cleared and which will form the bottom of the lake.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TAUTIM19650527.2.8
Bibliographic details
Taupo Times, Volume XIV, Issue 41, 27 May 1965, Page 1
Word Count
76The site of the Taupo Borough Council's second power project on the Hinemaiaia River. The retaining wall for the dam will cut across the earthworks in the centre of the picture and the water will back up through the "S" shaped scrub covered gorge just above which it is 50ft. deep. The earthworks in the background show the area from which scrub and trees have been cleared and which will form the bottom of the lake. Taupo Times, Volume XIV, Issue 41, 27 May 1965, Page 1
Using This Item
Stuff Ltd is the copyright owner for the Taupo Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.