COMBATING EROSION
WORK AT ARAPUNI PROTECTIVE MEASURES l From Our Own Correspondent) HAMILTON, Today. The work at Arapuni that is beingcarried out to check the erosion at the spillway is proving effective, according to the officer in charge, Mr. T. Rabone. Mr. Rabone added that more protec-tive-works are to be carried out, and it may be necessary to divert the water through the tunnel while work at the spillway is in progress.
The Public Works Department, has requested owners of boats on the lake to haul them clear of the water and to leave them secured.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19290902.2.7
Bibliographic details
Sun (Auckland), Volume III, Issue 757, 2 September 1929, Page 1
Word Count
96COMBATING EROSION Sun (Auckland), Volume III, Issue 757, 2 September 1929, Page 1
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.