“ALMOST HUMAN”
CITY POWER SUPPLY NEW AUTOMATIC PLANT Described as being “almost human,” the new automatic gear installed in the King’s Wharf station was inspected by members of the Auckland Power Board at the close of yesterday’s meeting. The new plant will convert the station into an almost wholly automatic power distributor when the supply from Arapuni is available, and the automatic ge&r will* enable power distribution to be handled with the minimum of manual labour. The plant will automatically deal with breakdowns and practically take charge of the whole station. Yesterday an automatic power failure was created and the plant remedied it. In addition, it was shown how other machines were automatically brought into action to take over when the voltage became too high. It was explained that practically every known fault was provided for, and a complete “shut-down” of power from Arapuni was demonstrated, showing that a failure from this source would immediately bring other units into operation.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19281211.2.181
Bibliographic details
Sun (Auckland), Volume II, Issue 534, 11 December 1928, Page 18
Word Count
160“ALMOST HUMAN” Sun (Auckland), Volume II, Issue 534, 11 December 1928, Page 18
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.