BIG POWER SCHEME
SUPPLY OF ELECTRICITY FROM SCOTTISH LOCH " London, October 15. Another stage in the progress of the Lochahey ..water power scheme was reaphed- with - the qompletion of the Laggen pressure tunnel, three miles, long and 15, feet in diameter, through whiph th© water of , . Loch Laggen- and the Spean, River will be tuyned- in the Loch Treig, Inverness. - ;=The scheine, "which is heing undertaken by private enterprise, ineludeS some- of the , biggest - engineering works of the kind carried out ■ in Great Britain. It js designed t,p tap the Scottish loeh in order to produce electrical energy for the manufacture of aluminium. The plant will, have a capacity of 130,000 horse power when. completed. » t
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/RMPOST19321017.2.38
Bibliographic details
Ngā taipitopito pukapuka
Rotorua Morning Post, Volume 2, Issue 355, 17 October 1932, Page 5
Word count
Tapeke kupu
116BIG POWER SCHEME Rotorua Morning Post, Volume 2, Issue 355, 17 October 1932, Page 5
Using this item
Te whakamahi i tēnei tūemi
NZME is the copyright owner for the Rotorua Morning Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.