THE LOW-LEVEL BRIDGES.
"COMPLETING THE APPROACHES. The new road between Te Awamutu and Putaruru across the lowlevel bridge at Arapuni was not open by Monday, but the completion of the road approach on the Te Awamutu side of the bridge was pvoreeding, and it is expected that the route will be available ony day now.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/PUP19241113.2.12.6
Bibliographic details
Putaruru Press, Volume II, Issue 55, 13 November 1924, Page 2
Word Count
55THE LOW-LEVEL BRIDGES. Putaruru Press, Volume II, Issue 55, 13 November 1924, Page 2
Using This Item
Stuff Ltd is the copyright owner for the Putaruru Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.