ATIAMURI-MOKAI.
The Public* Works Department is constructing a direct road from Atiamuri to Mokai. Most of the length has already been formed but a gap of about two miles still remain:.. This awaits the return of the gang, who arc at present engaged in constructing th-3 Mangaiti deviation, on which they are now working from the Kopokarahi end.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/MATREC19230924.2.26.2
Bibliographic details
Matamata Record, Volume VI, Issue 474, 24 September 1923, Page 4
Word Count
58ATIAMURI-MOKAI. Matamata Record, Volume VI, Issue 474, 24 September 1923, Page 4
Using This Item
Stuff Ltd is the copyright owner for the Matamata Record. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.