STATE HOUSING BLOCK
SEWER MAIN EXTENSION FORMATION OF ROAD Reporting to the Gisborne Borough Council last night, the borough engineer, Mr. E. R. Thomas, stated that the Northcote road extension of the sewer main and road formation to link up with the State housing block roading was now completed as far as possible and the No. 13 scheme men on the work had been transferred to Kaiti Hill road improvements. The extension of the water main had not been possible owing to supplies of pipe being unavailable.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/GISH19391213.2.166
Bibliographic details
Gisborne Herald, Volume LXVI, Issue 20119, 13 December 1939, Page 12
Word Count
87STATE HOUSING BLOCK Gisborne Herald, Volume LXVI, Issue 20119, 13 December 1939, Page 12
Using This Item
The Gisborne Herald Company is the copyright owner for the Gisborne Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of the Gisborne Herald Company. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.