MAIN TRUNK NOW OPEN
LINE DAMAGE AT KOPUTABOA REPAIRED The Main Trunk raiiway, which has been closed between Koputaroa j and Shannon since Sunday after- j noon because of the floods, was opened again at noon today. The flood waters receded from the line last night and engineering| gangs, working since daylight this j morning, repaired the damage toj the permanent way. This was not as serious as was first thought to be the case. First train over the line after it had been opened was the Welling-ton-New Plymouth express, which passes through Levin at 12.10 p.m. The transhipping of train passengers by bus between Levin qmd Shannon was contipued through - out yesterday and this morning, but it is now no longer necessary.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHRONL19470701.2.17
Bibliographic details
Chronicle (Levin), 1 July 1947, Page 4
Word Count
123MAIN TRUNK NOW OPEN Chronicle (Levin), 1 July 1947, Page 4
Using This Item
NZME is the copyright owner for the Chronicle (Levin). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.