CAMBRIDGE-ROTORUA ROAD.
We are glad to learn that this road is at last open foi traffic. The contractor, Mr Horne, inform-) \is that the load is open right through to Rotorua, and that though the portion thxough the bush is unpleasant and heavy travelling after a few days rain, buggies can make the trip over the new line with safety. This fact should materially inciease the patronage of the Waikato route to Rotorua, a-< tomists will now be able to make the journey in a buggy thiough from Cambiidge to Rotorua in a day easily, No doubt, as the tourist traffic mcie.ises^ some enterprising hotelkeeper will see fit to ci cot an hotel or accommodation house somewheie in the vicinity of the bu^h.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/WT18840103.2.9
Bibliographic details
Ngā taipitopito pukapuka
Waikato Times, Volume XXII, Issue 1793, 3 January 1884, Page 2
Word count
Tapeke kupu
123CAMBRIDGE-ROTORUA ROAD. Waikato Times, Volume XXII, Issue 1793, 3 January 1884, Page 2
Using this item
Te whakamahi i tēnei tūemi
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.