OIL DRILLING
OPERATIONS AT MORERE. (By Telegraph—Press Association.) GISBORNE, April 10. A bulletin issued by the New Zealand Petroleum Company reports that at the Morere oil bore operations for the recovery of a drillpipe are still continuing. The Midhurst well has been drilled to a depth of 6185 feet. The formation is hard, grey shale.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/WAITA19410412.2.101
Bibliographic details
Ngā taipitopito pukapuka
Wairarapa Times-Age, 12 April 1941, Page 8
Word count
Tapeke kupu
55OIL DRILLING Wairarapa Times-Age, 12 April 1941, Page 8
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Wairarapa Times-Age. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.