Montreal. —Work has begun on the construction of a new hangar for the Trans-Canada Air Lines at Montreal's new airport now under development at Dorval, near here. Co-operating with the Dominion Department of Transport in its construction programme, the TCA expects ot have the hangar ready for occupation by July first next year. The Department of Transport is laying out runways and erecting an administration building. As a commercial airport, Dorval will replace St. Hubert, which will be taken over for war purposes. The T.C.A. building will be the largest hangar ever erected in Canada as one unit.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/WAITA19401227.2.74.8
Bibliographic details
Ngā taipitopito pukapuka
Wairarapa Times-Age, 27 December 1940, Page 7
Word count
Tapeke kupu
98Untitled Wairarapa Times-Age, 27 December 1940, Page 7
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Wairarapa Times-Age. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.