TWO-YEAR PROGRAMME
RECONSTRUCTION OF BRIDGES MASTERTON COUNTY PLAN A two-year programme of bridge reconstruction was decided on at today’s meeting of the Masterton County Council. The following is a schedule of the bridges it is proposed to be included and Messrs Seaton, Sladden and Pavitt have been requested to furnish a detailed estimate in respect to each bridge. Main Highways: —No. 63, Masterton Weber Highway, Wangaehu Bridge at 10.6 M.; No. 65 Masterton Stronvar Highway, Wangaehu Overflow Bridge at 0.7 M.; No. 65 Masterton Stronvar Highway, Bridge near Longbridge at f.IM.; No. 441 Te Ore Ore Bideford Highway, Bridge near Sulphur Wells at 0.75 M; No. 441 Te Ore Ore Bideford Highway, Bridge near Bridge Creek, at 4.25 M.; No. 516 Blairlogie Langdale Highway, Mangapokia Stream Bridge No. 2 at Blairlogie. Riding Roads: — Waingawa - Camp Road Bridge at 9.4 M.; Kiriwhakapapa Road Bridge, No. 1; Jackson’s Road Bridge; Northcroft's Road Bridge; Te Ore Ore Settlement Road Bridge; Waiorongo Road Bridge; Kaiwhata Stream Bridge, Ngahape.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/WAITA19380412.2.75
Bibliographic details
Ngā taipitopito pukapuka
Wairarapa Times-Age, 12 April 1938, Page 8
Word count
Tapeke kupu
164TWO-YEAR PROGRAMME Wairarapa Times-Age, 12 April 1938, Page 8
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Wairarapa Times-Age. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.