Road works workshop
A Lime Stabilization Workshop sponsored by the Pavements Committee of the Road Research Unit of the National Roads Board was hosted by the Rangitikei County in September. During the Workshop an inspection was made of the liming operation on Turakina Valley Road at Drysdale.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/WAIBUL19881101.2.56
Bibliographic details
Ngā taipitopito pukapuka
Waimarino Bulletin, Volume 6, Issue 261, 1 November 1988, Page 16
Word count
Tapeke kupu
47Road works workshop Waimarino Bulletin, Volume 6, Issue 261, 1 November 1988, Page 16
Using this item
Te whakamahi i tēnei tūemi
Ruapehu Media Ltd is the copyright owner for the Waimarino Bulletin. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Ruapehu Media Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.