Road works completed
The Waimarino County overseer, Colin Trow, told a recent council meeting that reseals on Whangaehu Valley Road, Mangateitei Overbridge, Lakes Road, Mangaeturoa South Road and Middle Road have been completed. I he upgrading work on Pipiriki Road is continuing and the culvert installation is complete. Work has now started on the seal preparation, he reported. Metalling on Mangaeturoa South Road is now being carried out and miscellaneous works and earthworks should now be completed on that road.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/WAIBUL19860318.2.33
Bibliographic details
Ngā taipitopito pukapuka
Waimarino Bulletin, Volume 3, Issue 40, 18 March 1986, Page 12
Word count
Tapeke kupu
80Road works completed Waimarino Bulletin, Volume 3, Issue 40, 18 March 1986, Page 12
Using this item
Te whakamahi i tēnei tūemi
Ruapehu Media Ltd is the copyright owner for the Waimarino Bulletin. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Ruapehu Media Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.