Preparations for ski season begins
Mountain Final tidy up on Jumbo T-Bar following major installation work. Sheave assemblies (support for the cable) taken to Auckland for galvanising (for protection against weather) and finetuning of the lift for '84 season. The Giant chairlift and Parklane chairlift motors are being checked and overhauled to ensure trou-ble-free running in addition to annual maintenance checks on the total lift system.
Work under way on the installation of an additional 570 metres of snow fencing to ensure an optimum cover of snow around lift facilities and trails. Promotion Turoa's saies manager Andy Chapman, who was appointed -last year, is attending his first Brisbane Snow Show from 8-10 March. He is also visiting local travel agents and tourist offices during his week-long stay in Queensland's capital.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/WAIBUL19840313.2.12
Bibliographic details
Ngā taipitopito pukapuka
Waimarino Bulletin, Volume 1, Issue 38, 13 March 1984, Page 3
Word count
Tapeke kupu
130Preparations for ski season begins Waimarino Bulletin, Volume 1, Issue 38, 13 March 1984, Page 3
Using this item
Te whakamahi i tēnei tūemi
Ruapehu Media Ltd is the copyright owner for the Waimarino Bulletin. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Ruapehu Media Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.