NEW GOLDEN CROWN
Messrs A. and G. Price will have the water motor finished on Saturday next, and in about a fortnight from date the battery will be ready to start, everything being now ready pending the erection of the engine. Last week the battery was connected with the County main by a ten inch pipe. In the mine the manager has suspended operations on Herival's leader in the old stopes, and is driving at the intermediate level, parallel with the boundary to intersect the lode at its junction with another leader. Herival's leader, when worked by the Caledonian tributers, yielded splendid crushing stuff, and the manager is in possession of information which leads him to believe there is still some remunerative quartz in the direction he is driving. He expects to hare to drive 30 feet further ere the junction referred to is reached. Some thres. weeks ago, to avoid the present circuitous route, the manager commenced driving a new cross-cut at the battery level. This is now in about 100 feet, and the No. 1 lode has been cut, and connection established with the first operations on the lode. Where intersected the quartz has a rery healthy appearance.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/THS18800830.2.20.3
Bibliographic details
Ngā taipitopito pukapuka
Thames Star, Volume XI, Issue 3643, 30 August 1880, Page 3
Word count
Tapeke kupu
200NEW GOLDEN CROWN Thames Star, Volume XI, Issue 3643, 30 August 1880, Page 3
Using this item
Te whakamahi i tēnei tūemi
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.