PETROLEUM.
TAEANAKI (STEW ZEALAND) OIL WELLS, LIMITED.
NO. 1 BORE AT BELL BLOCK
No. 1 is down to a depth of 780 je'et. At No. 2 drilling operations, which were delayed owing to the non-arrival of the 10-inch casing, have been resumed. The easing has come to hand and the whole of it has been placed in position in the bore. This will be followed by -the 8ineh casing.
At No. 5 bore the new derrick has been erected and the well has been sandpumped and deepened. The final shipment of plant for the refinery has arrived in Wellington and will be transhipped next week.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/TDN19130113.2.19
Bibliographic details
Ngā taipitopito pukapuka
Taranaki Daily News, Volume LV, Issue 200, 13 January 1913, Page 4
Word count
Tapeke kupu
105PETROLEUM. Taranaki Daily News, Volume LV, Issue 200, 13 January 1913, Page 4
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Taranaki Daily News. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.