PETROLEUM NEWS
The Taranaki Petroleum Company's manager, Mr. L. Keith, reported last night that at No. 3 bore oil had been flowing between the casings all day. Further developments of a satisfactory nature are expected to-day, when the lowering of the casing is complete. At No. 1. bore the work of casing the well is proceeding satisfactorily in difficult countiy. The flow of oil at No. 2 continues satisfactory.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/TDN19100902.2.52
Bibliographic details
Ngā taipitopito pukapuka
Taranaki Daily News, Volume LIII, Issue 123, 2 September 1910, Page 5
Word count
Tapeke kupu
69PETROLEUM NEWS Taranaki Daily News, Volume LIII, Issue 123, 2 September 1910, Page 5
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Taranaki Daily News. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.