PETROLEUM NEWS.
No. 2 well maintains her average production. Yesterday she flowed twenty barrels, and on Saturday and Sunday the same. Work at both Nos. 1 and 3 is going on satisfactorily. Drilling is proceeding at No. 3, and reaming at No. 1. It ,is expected that work in connection with the latter will take another five or six weeks. <• The Hawera Show exhibit went away yesterday, in charge of Mr. Gtfevin.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/TDN19100712.2.54
Bibliographic details
Ngā taipitopito pukapuka
Taranaki Daily News, Volume LIII, Issue 79, 12 July 1910, Page 5
Word count
Tapeke kupu
72PETROLEUM NEWS. Taranaki Daily News, Volume LIII, Issue 79, 12 July 1910, Page 5
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Taranaki Daily News. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.