ROAD LINK TO TE AWAMUTU
The Mangawhio Gorge bridge, the opening of which will give direct acoese between Mangakino and Kihikihi. is expected to be completed during the current financial year, reported the chairman of the 2B District Roads Council and District Commissioner of Works, Mr N. C. McLeod, to the cotmcil meeting at Raglan on Thursday. Fabrication of the steel arches for the bridge was nearing completion, and tenders had been called for site erection and the construction of the bridge superstructure.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TAUTIM19650511.2.19
Bibliographic details
Taupo Times, Volume XIV, Issue 36, 11 May 1965, Page 4
Word Count
83ROAD LINK TO TE AWAMUTU Taupo Times, Volume XIV, Issue 36, 11 May 1965, Page 4
Using This Item
Stuff Ltd is the copyright owner for the Taupo Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.