Lakefront Highway
During the recent visit to Taupo of Mr Goosman and the members of the National Roads Board, Mr Goosman state d that the delay in starting work on the re-formation and resealing of the Lakefront Highway was due to lack of engineering staff, and that if the Borough Council could get an engineering survey done locally it would assist the Ministry of Works. Messrs Cheal & Nelson, surveyors, have now advised the Council that they will be pleased to carry out the survey at an early date.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/TAUTIM19560113.2.31
Bibliographic details
Ngā taipitopito pukapuka
Taupo Times, Volume IV, Issue 206, 13 January 1956, Page 5
Word count
Tapeke kupu
88Lakefront Highway Taupo Times, Volume IV, Issue 206, 13 January 1956, Page 5
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Taupo Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.