ADDITIONS TO TAUPO SCHOOL
A three-classroom unit recently completed at the Taupo District High School. Such room has an, "activity bay," fitted with shelves, bench and storage cupboards for pupils project work. The buiiding has central-heating equipment and is the first of the Taupo School buildings to be so fitted. The new! classrooms are occupied by Stds. 1 and 2 (Mr J. Horne) ; Form I (Mr R. Henry) ; and Form II (Mr K. Graharn, First Assistant). The buiiding in the background is a two-classroom pre-fabricated unit.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TAUTIM19541203.2.11
Bibliographic details
Taupo Times, Volume III, Issue 149, 3 December 1954, Page 1
Word Count
86ADDITIONS TO TAUPO SCHOOL Taupo Times, Volume III, Issue 149, 3 December 1954, Page 1
Using This Item
Stuff Ltd is the copyright owner for the Taupo Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.