Boring at Aratiatia.
The expl oratory boring being carHed ut at the Aratiatia Rapids is now nearing the completition of the preliminary stage. Between forty and fifty holes have been drilled, to varying depths, in order to ascertain the nature of the rock lying below the area and the suitability of the locality for the construction of hydro-electric works. The first stage in exploratory work of this nature generally consists in the drilling of sufficient holes, in conjunetion with other research, to enable a decision to ie made on the apparent suitability of a given area. I-f the results of such work appear to be favonrable the next stage is usually the sclection of a tentative site for the contemplated works, which site is then much more intensively tested by further boring.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TAUTIM19530408.2.31.4
Bibliographic details
Taupo Times, Volume II, Issue 64, 8 April 1953, Page 7
Word Count
132Boring at Aratiatia. Taupo Times, Volume II, Issue 64, 8 April 1953, Page 7
Using This Item
Stuff Ltd is the copyright owner for the Taupo Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.