TAUPO-TURANGI ROAD WORKS
MOTOR DRIVERS WARNED W ork has commenced on the reconstruction of the unsealed portion of flatepe Hill and the Bluff section just past Hallett's Bay. The contractors for the work (Messrs Taylor and Cully Ltd., of Hamilton), advise that about 60,000 yards of earth will be moved. During the period of this work motor drivers should proceed carefully at diminished speed.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TAUTIM19520611.2.6
Bibliographic details
Taupo Times, Volume I, Issue 22, 11 June 1952, Page 1
Word Count
64TAUPO-TURANGI ROAD WORKS Taupo Times, Volume I, Issue 22, 11 June 1952, Page 1
Using This Item
Stuff Ltd is the copyright owner for the Taupo Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.