Sealing of Tongariro Street.
After considerahle delays due to the unusual climate conditions experienced in Taupo over a recent period, progress is now being made with the paving of Taupo' s main thoroughfare, Tongariro Street. The present coating just laid down is known technically as priming, and must be given an interval of three weeks to set before the final sealing is laid down. This is a welcome improvemient, for Tongariro Street on a dusty day was not a very pleasant thoroughfare for shoppers.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TAUTIM19520123.2.7
Bibliographic details
Taupo Times, Volume I, Issue 2, 23 January 1952, Page 1
Word Count
84Sealing of Tongariro Street. Taupo Times, Volume I, Issue 2, 23 January 1952, Page 1
Using This Item
Stuff Ltd is the copyright owner for the Taupo Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.