PLENTY OF WATER FOR AUCKLAND. —With the completion this week of the new Huia Dam, pictured above, the City will have ample water for several years, even in the event of a drought. When the dam is full the waterlevel will reach the honeycomb spillway near the top.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19291004.2.7.1
Bibliographic details
Sun (Auckland), Volume III, Issue 785, 4 October 1929, Page 1
Word Count
48PLENTY OF WATER FOR AUCKLAND.—With the completion this week of the new Huia Dam, pictured above, the City will have ample water for several years, even in the event of a drought. When the dam is full the waterlevel will reach the honeycomb spillway near the top. Sun (Auckland), Volume III, Issue 785, 4 October 1929, Page 1
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.