THE SYDNEY HARBOUR BRIDGE, the approaches to which are practically complete, is now taking definite shape. The arch is being built cut over_the water from both shores. The picture shows how the wprk is progressing on the City sude. Note the Size of the men compared with thei steel beams of this massngo structureg.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19290720.2.20.1
Bibliographic details
Sun (Auckland), Volume III, Issue 720, 20 July 1929, Page 1
Word Count
54THE SYDNEY HARBOUR BRIDGE, the approaches to which are practically complete, is now taking definite shape. The arch is being built cut over_the water from both shores. The picture shows how the wprk is progressing on the City sude. Note the Size of the men compared with thei steel beams of this massngo structureg. Sun (Auckland), Volume III, Issue 720, 20 July 1929, Page 1
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.