KELSTON DRAINAGE
RECOMMENDATIONS BY BOROUGH ENGINEER
Three methods of extending the sewerage system through the new Kelston area were reported on by the borough engineer at Tuesday’s meeting of the New Bynn Borough Council. One was by extending the main sewer from Rimu Street to a point in Manuka Street near the old town board district boundary. A second proposal consisted of laying 9in and Gin pipes from the encl of the present main sewer at a flat grade round the slopes below Nikau Street and Manuka Street. A third proposal consisted of merely extending the 6in branch drains from their present termini. The council eventually decided to submit a copy of the report to the Keiston Ratepayers’ Association for its recommendation.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19290626.2.142
Bibliographic details
Sun (Auckland), Volume III, Issue 699, 26 June 1929, Page 13
Word Count
122KELSTON DRAINAGE Sun (Auckland), Volume III, Issue 699, 26 June 1929, Page 13
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.