MINING NEWS
MAORI LAND.—The secretary of the Maoriland Mine has returned from a visit to the mine at Waitekauri. He reports that the contractors are making good progress driving south on the reef in No. 4 level, 150 tons of ore being taken out and paddocked. The battery was also inspected, and it is estimated that it would take two to three week's work to place it in running order.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19280605.2.112.8
Bibliographic details
Sun (Auckland), Volume II, Issue 372, 5 June 1928, Page 14
Word Count
70MINING NEWS Sun (Auckland), Volume II, Issue 372, 5 June 1928, Page 14
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.