OTIRA TUNNEL RECORD
2,500 TONS THROUGH TO-DAY Press Association. GKEYMOUTH, To-day. Coal and timber amounting: to 2,500 tons were railed through the Otira Tunnel from the West Coast to-day in 10 full trains. This constitutes a day’s record since the opening of the tunnel.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19280418.2.115
Bibliographic details
Sun (Auckland), Volume II, Issue 332, 18 April 1928, Page 13
Word Count
44OTIRA TUNNEL RECORD Sun (Auckland), Volume II, Issue 332, 18 April 1928, Page 13
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.