TARANAKI OIL
BORING PREPARATIONS Press Association. GISBORNE, Friday. The operations of the Taranaki Oilfields, Ltd., at Morere, have reached a stage when all preparations for actual boring are complete. The company now awaits the arrival of drillers from America, to proceed with the work, which will be continued through the winter.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19270528.2.126
Bibliographic details
Sun (Auckland), Volume 1, Issue 56, 28 May 1927, Page 15
Word Count
51TARANAKI OIL Sun (Auckland), Volume 1, Issue 56, 28 May 1927, Page 15
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.