SHANNON BRIDGE.
COMPLETION IN MARCH. It was announced at Tuesday’s meeting of the Manawatu County Council by® the chairman (Cr. W. E. Barber) that the new bridge over the Manawatu river would be completed- in. March next. In connection with the road approaches, it was noticed that no Provision had been made in the Public Works Estimates for these works, and it was necessary that they should be completed when the bridge is opened. The chairman said that he had drawn the attention of the Main Highways Board to the position, wh'.ch would be given the attention desired.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/SNEWS19271216.2.13
Bibliographic details
Ngā taipitopito pukapuka
Shannon News, 16 December 1927, Page 3
Word count
Tapeke kupu
98SHANNON BRIDGE. Shannon News, 16 December 1927, Page 3
Using this item
Te whakamahi i tēnei tūemi
Copyright undetermined – untraced rights owner. For advice on reproduction of material from this newspaper, please refer to the Copyright guide.