Tongariro DoC structures cleared for safety
Engineering checks have been completed on Department of Conservation structures in the Tongariro Taupo Conservancy. The viewing platform above Huka Falls which was closed by the department last week, remains closed until additional bracing work has been carried out. The work is an added safety precaution and the viewing platform is expected to be re-opened by the end of the week. Other structures which have been checked and cleared by independent engineers are: Huka Fall bridge; Aratiatia
Walkway viewing platforms (2); Craters of the Moon footbridge (2), boardwalk, viewing platforms (2); Aratiatia Rapids viewing platform; Major Jones swingbridge; Red hut swingbridge; Pillars of Hercules footbridge; Maunganamu viewing platform; Tokaanu Thermal Walk boardwalk and viewing platform; Te Porere bridges (2) and viewing platform; Tongariro River lookout. A total of 59 Department of Conservation structures throughout the country have been cleared following inspection by structural engineers.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/RUBUL19950509.2.22
Bibliographic details
Ngā taipitopito pukapuka
Ruapehu Bulletin, Volume 12, Issue 585, 9 May 1995, Page 5
Word count
Tapeke kupu
150Tongariro DoC structures cleared for safety Ruapehu Bulletin, Volume 12, Issue 585, 9 May 1995, Page 5
Using this item
Te whakamahi i tēnei tūemi
Ruapehu Media Ltd is the copyright owner for the Ruapehu Bulletin. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Ruapehu Media Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.