Foyle Street upgrade
Kerb and channel work for Foyle Street Ohakune, worth $25,000 should be considered for the 1993/94 council annual plan along with other worthy projects, the Waimarino Community Board has recommended. The work was part of the 92/93 plan but was withdrawn, along with road shape correction. The board had been asked to recommend that the work be included in the annual plan, but decided that all work for the plan should be considered at the same time, rather than piecemeal through the year.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/RUBUL19920908.2.56
Bibliographic details
Ngā taipitopito pukapuka
Ruapehu Bulletin, 8 September 1992, Page 15
Word count
Tapeke kupu
86Foyle Street upgrade Ruapehu Bulletin, 8 September 1992, Page 15
Using this item
Te whakamahi i tēnei tūemi
Ruapehu Media Ltd is the copyright owner for the Ruapehu Bulletin. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Ruapehu Media Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.