Sampling Continues
The water treatment plant has been 'making water' for some time now, but the final allclear is yet to be given. Before the water can be deemed safe to drink without boiling the town's reticulation system peeds to be flushed. Initially problems occurred in certain streets in the town where there were dips in the main, such as in Arawa Street. District engineer Don Sattler said the council will test water at the ends of a selection of lines, three times a week for three months to monitor the system. Samples will be sent to Palmerston North and
Wellington for testing for bacteria, colour and turbidity, as well as giardia and cryptospuridium. Ski comparison A water monitoring system is currently being installed at Salt Lake City by the contractors involved in the Ohakune project. After a presentation on the merits of the Lester Abbey system, discussion centred on the merits of skiing at Salt Lake City versus Ohakune. It was generally agreed skiing was better in Ohakune, in August, but better in Salt Lake City in February!
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/RUBUL19920811.2.37.4
Bibliographic details
Ngā taipitopito pukapuka
Ruapehu Bulletin, 11 August 1992, Page 11
Word count
Tapeke kupu
179Sampling Continues Ruapehu Bulletin, 11 August 1992, Page 11
Using this item
Te whakamahi i tēnei tūemi
Ruapehu Media Ltd is the copyright owner for the Ruapehu Bulletin. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Ruapehu Media Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.