Karioi power project under study
Karioi's hydro power scheme is still under study, with independent engineers checking the proposal for one of the potential major investors. King Country Energy general manager Peter Till said Works Consultancy is surveying the tunnel route and various sites for the project. "There is no definite decision yet but at least they're interested enough to spend the money on surveying," said Mr Till.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/RUBUL19911105.2.8
Bibliographic details
Ngā taipitopito pukapuka
Ruapehu Bulletin, Volume 9, Issue 411, 5 November 1991, Page 1
Word count
Tapeke kupu
68Karioi power project under study Ruapehu Bulletin, Volume 9, Issue 411, 5 November 1991, Page 1
Using this item
Te whakamahi i tēnei tūemi
Ruapehu Media Ltd is the copyright owner for the Ruapehu Bulletin. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Ruapehu Media Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.