Whakapapa summer progress
Work on the Whakapapa Happy Valley snowmaking system is going well, with water reticulation pipes due to be installed soon. The pipes will be flown in by helicopter. Tenders are still being sought for the construction of a new creche building at the top of the Bruce, and work is under way on improving the Knoll Ridge cafe toilets. Marketing manager Scott Lee said work the regional marketing plan, which involves Whakapapa, Turoa and "almost all" of the area's tourist operators, is going well. He said response to the plan has been almost universally positive, even though some of the smaller operators can not afford to take part. He said there has been no ill-feeling towards those operators, and that their support is still welcome. "It is a little expensive for some people, especially for many who have financial problems at present," he said. A progress meeting is
to be held at the Chateau on Monday 11 March, which will be the last
chance for people to join in the programme, said Mr Lee. The draft
for the promotion flier will be presented at the meeting.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/RUBUL19910305.2.20
Bibliographic details
Ngā taipitopito pukapuka
Ruapehu Bulletin, Volume 8, Issue 376, 5 March 1991, Page 3
Word count
Tapeke kupu
189Whakapapa summer progress Ruapehu Bulletin, Volume 8, Issue 376, 5 March 1991, Page 3
Using this item
Te whakamahi i tēnei tūemi
Ruapehu Media Ltd is the copyright owner for the Ruapehu Bulletin. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Ruapehu Media Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.