OHAKUNE DUMP CLEAN-UP
District engineer Don Sattler told the council last week the the Ohakune dump approach road should soon be back in an acceptable condition. In answer to Councillor Snow Brannigan, who said the dump road was too narrow and messy, Mr Sattler said he had met with the contractor responsible who is to put in a larger machine to rectify the situation.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/RUBUL19890801.2.17
Bibliographic details
Ruapehu Bulletin, Volume 6, Issue 297, 1 August 1989, Page 4
Word Count
64OHAKUNE DUMP CLEAN-UP Ruapehu Bulletin, Volume 6, Issue 297, 1 August 1989, Page 4
Using This Item
Ruapehu Media Ltd is the copyright owner for the Ruapehu Bulletin. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Ruapehu Media Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.