RANGATAUA SEWERAGE FIGURES DUE SOON
Waimarino councillors were told recently that the Rangataua Sewerage Scheme final costs would not exceed $350,000, which would attract a $128,000 subsidy contribution. District Engineer Don Sattler said he was still waiting for verification of costs, which would be checked against the estimates then broken down to a figure per Rangataua lot owner.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/RUBUL19890711.2.2.4
Bibliographic details
Ruapehu Bulletin, Volume 6, Issue 294, 11 July 1989, Page 1
Word Count
58RANGATAUA SEWERAGE FIGURES DUE SOON Ruapehu Bulletin, Volume 6, Issue 294, 11 July 1989, Page 1
Using This Item
Ruapehu Media Ltd is the copyright owner for the Ruapehu Bulletin. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Ruapehu Media Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.