OFFICIAL OPENING
The new borough sewerage pumping station in King Street, fruit of many months of tribulation, hard work, difficulties, and controversy, will be officially opened next Monday afternoon by the Mayor, Mr. T. Jackson. ' The workmen have now completed the installation of the punrping machinery and electrical fittings, last link in a chain which has take.n considerable forging.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/RMPOST19320316.2.53.3
Bibliographic details
Rotorua Morning Post, Volume 1, Issue 174, 16 March 1932, Page 6
Word Count
59OFFICIAL OPENING Rotorua Morning Post, Volume 1, Issue 174, 16 March 1932, Page 6
Using This Item
NZME is the copyright owner for the Rotorua Morning Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.