ROAD THROUGH PUTARURU.
MAINTENANCE POSITION. In a further letter in reply to the council Mr. Handman wrote that in accordance with the Arapuni contracts the Arapuni access road right from the Arapuni railway siding had to be metalled by the Public Works Department and maintained then by the contractors.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/PUP19241120.2.13.4
Bibliographic details
Putaruru Press, Volume II, Issue 56, 20 November 1924, Page 2
Word Count
49ROAD THROUGH PUTARURU. Putaruru Press, Volume II, Issue 56, 20 November 1924, Page 2
Using This Item
Stuff Ltd is the copyright owner for the Putaruru Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.