FLOOD PROTECTION SCHEME.
DEPUTATION TO WAIT ON MINISTERS. In view of the. recent refusal of the' Government to make a grant at present towards the cost of the Ma-liawatu-Oroua River Board’s scheme of flood protection, a deputation is to wait upon the Prime Minister and the Ministers of Public Works and Agriculture to place (lie matter before them again. The deputation, which has been arranged by Messrs J. Linklater, ALP., and j. A. Nash, ALP., will interview the Afinisters at Wellington on Wednesday morning.
If the Government can be prevailed upon 1 to make a grant for the scheme, wo ilk would be found for at least 100 men for a period of from two to three years.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/MH19300705.2.36
Bibliographic details
Ngā taipitopito pukapuka
Manawatu Herald, Volume LI, Issue 4474, 5 July 1930, Page 4
Word count
Tapeke kupu
118FLOOD PROTECTION SCHEME. Manawatu Herald, Volume LI, Issue 4474, 5 July 1930, Page 4
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Manawatu Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.