SHANNON BRIDGE.
OPEN FOR TRAFFIC. •Motorists in general will he pleased to learn jthat the new bridge, whicli has been erected over the Manawatu River at Moutoa is now open ti v affi[c. This means that the punt which has formed the connecting link between both sides of the river on the Foxton-Shannon Main highway since the old bridge was washed away is now out of use and the new bridge will no doubt be welcomed by both the residents of Moutoa and the travelling public. An official .opening ceremonyjiyill be held early in the New Year.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/MH19281229.2.25
Bibliographic details
Ngā taipitopito pukapuka
Manawatu Herald, Volume XLIX, Issue 3889, 29 December 1928, Page 3
Word count
Tapeke kupu
97SHANNON BRIDGE. Manawatu Herald, Volume XLIX, Issue 3889, 29 December 1928, Page 3
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Manawatu Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.