SHANNON BRIDGE.
TO BE COMPLETED BY MA&CH. n*. It was announced at Tuesday’s meeting of the Manawatu County Council by the chairman (Cr. W. E. Barber) that'the new bridge-over the Manawatu River would be completed in March next. In connection with the road approaches, it was noticed that no provision had been made in the Public Works Estimates for these works, and it was necessary that they should be completed when the bridge is opened. The chairman said that he had drawn the attention of the Main Highways Board to the which would be given the attentiondesired.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/MH19271215.2.23
Bibliographic details
Ngā taipitopito pukapuka
Manawatu Herald, Volume XLVIII, Issue 3730, 15 December 1927, Page 2
Word count
Tapeke kupu
97SHANNON BRIDGE. Manawatu Herald, Volume XLVIII, Issue 3730, 15 December 1927, Page 2
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Manawatu Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.