WORK AT MANGAHAO.
CURRENT BY NEXT JUNE? “Everything is going on all right according to programme,” stated the Hon. .T. G. Coates (Minister for Public Works) on Saturday morning with reference to his visit of inspection the day before to the hydro-electric development works at Mnngnhao. “From a layman’s point of view,” added the Minister, “the Mangabao dam seems to he the controlling factor; and, if we have the luck to go on without a flood, we should be ready to supply current by the end of June next.”
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/MH19230904.2.8
Bibliographic details
Ngā taipitopito pukapuka
Manawatu Herald, Volume XLV, Issue 2628, 4 September 1923, Page 2
Word count
Tapeke kupu
89WORK AT MANGAHAO. Manawatu Herald, Volume XLV, Issue 2628, 4 September 1923, Page 2
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Manawatu Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.