THE OHURA RAILWAY.
A telegraph message received from Mr JermitiKS to-day, states that C:\linet has decided to start tho StratlordMain Trunk railway at Te Koura, which is about five mihv< south of Ongaruo. The engineer advises that this saves over six miles of construction, also a monetary saving of .£70,000, besides the upkeep for all time. The, ceremony of turning tho first sod of the railway at Te Koura will be arranged at the earliest possible date and tho Premier will officiate.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/KCC19111104.2.19
Bibliographic details
Ngā taipitopito pukapuka
King Country Chronicle, Volume VI, Issue 411, 4 November 1911, Page 5
Word count
Tapeke kupu
82THE OHURA RAILWAY. King Country Chronicle, Volume VI, Issue 411, 4 November 1911, Page 5
Using this item
Te whakamahi i tēnei tūemi
Waitomo Investments is the copyright owner for the King Country Chronicle. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Waitomo Investments. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.