WORK ON BRIDGES
MAINTENANCE IN OHINEMURI KOMATA NORTH DRAINAGE Bridges at the Paeroa end of the Ohinemuri County were reported by the county engineer, Mr L. E. Shaw, at the April meeting of the county council, to have had heavy maintenance. The bridge over the Opukeko stream on Coronation road had been practically re-built, and the Tirohia river bridge had had further repairs. It had not been possible to proceed any further with Mill road bridge on account of not being able to procure re inf orc ng wire for the piles. A 3fiin. wooden culvert on the Wai-
toki road is in a state of collapse and concrete pipes for replacement have been ordered. In the Komata North drainage area difficulty had been experienced in getting labour for draining, but most of the main-outlets had been completed, or were under way, and most of the other work had now been let. The engineer’s report was adopted.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/HPGAZ19440428.2.19
Bibliographic details
Ngā taipitopito pukapuka
Hauraki Plains Gazette, Volume 53, Issue 32424, 28 April 1944, Page 5
Word count
Tapeke kupu
157WORK ON BRIDGES Hauraki Plains Gazette, Volume 53, Issue 32424, 28 April 1944, Page 5
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Hauraki Plains Gazette. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.