WORKS IN THE COUNTY.

REPORT OF ENGINEER. RECORDS FOR MARCH. ■ - ?■■ V - ; ■ The following report was submitted by the engineer (Mr E. Shatv) to Wednesday’s meeting of the Ohinemuri County Council: — “The. following works have been completed: Forming, metalling, and eulverting portion of the Waitawhe-ta-Waihi road ; metalling qjor.tion of Farrelly’is- Road, Waikino ; the approaches and concrete crossing over the Waitekauri River at Chappell’s, Waikino ; an_d a.IS(O the metalling of Ryall’s Road, Paeroa ,is about completed. The filling in of the approaches fo the Wai tote bridge was, completed by the Public Works Department, and the metalling was carried out by each local, body on the respective ends. The western approach to the temporary bridge passed through Mr Dean’s property, and Was metalled, and under agreement with him, wheh the new structure wats 1 completed the old metal would be taken up and removed.- This has been done and the metal placed on the new approacn. The approaches to the overhead bridge on the Old Tauranga Road are being proceeded with. ...■■■ '

.“The grader is at present in use on Tierney’s Road, Waihi, and other roads in the Waihi and Waikino ridings shall receive attention before it is removed.

“The. dam in the Karangahake gorge has been stripped of practically all its sheeting, and is now safe during time of flood. A fair amount of useful timber has been taken out, and the remaining timber I expect to remove after the next flood, which I a,m hoping will remove, the. silt and gravel from its base. “The metalling ’ of the main Te Aroha road at Waitoki is progressing satisfactorily, 40 chains having been completed, and should the Weather remain favourable the work < will be finished in about two, weeks.

“Crushing is being proceeded with a.t the quarry at Komata, and the metal is being delivered to the various roads. ■ I find it| will be necessary to increase the . quantity required on the Paeroa-Te Aroha road by an extra 100 cubic yards, and also on Puke Road by another 50 yards owing to wea-r and .tear by the increased-traffic-“A 16ft span bridge over the waterrace at Poland Road, Waikino, has collapsed. The Waihi Gold Mining Co., Ltd., disclaims responsibility, and states; that, the race was in existence prior to the road put in.. This is, a matter -that requires to be. looked into, .and if it is found otherwise the company will be charged with the cost. I intend replacing the (structure ! at an early date.”

Permanent link to this item
Hononga pūmau ki tēnei tūemi

https://paperspast.natlib.govt.nz/newspapers/HPGAZ19260407.2.4

Bibliographic details
Ngā taipitopito pukapuka

Hauraki Plains Gazette, Volume XXXVII, Issue 4959, 7 April 1926, Page 1

Word count
Tapeke kupu
412

WORKS IN THE COUNTY. Hauraki Plains Gazette, Volume XXXVII, Issue 4959, 7 April 1926, Page 1

WORKS IN THE COUNTY. Hauraki Plains Gazette, Volume XXXVII, Issue 4959, 7 April 1926, Page 1

Help

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert